SCASPA TO HOLD SEABED BREAKING CEREMONY FOR CONSTRUCTION OF SECOND CRUISE PIER AT PORT ZANTE ON MAY 15  

Get our headlines on WHATSAPP: 1) Save +1 (869) 665-9125 to your contact list. 2) Send a WhatsApp message to that number so we can add you 3) Send your news, photos/videos to times.caribbean@gmail.com

 

Basseterre, St. Kitts, May 11, 2018 (SKNIS): St. Christopher Air and Sea Ports Authority (SCASPA) will hold the Seabed Breaking Ceremony at the Port Zante Cruise Terminal on Tuesday 15th May, 2018, at 4:30 pm for the construction of the second cruise pier. The general public is invited to witness this historic ceremony.

The Seabed Breaking Ceremony comes after a job fair and Local Sub-Contractor Work Packages Presentation on Saturday, 12th May, 2018, at the Tucker Clark Primary School in Newtown at 10:00 am. JV Driver, the Canadian Commercial Corporation’s (CCC) Prime Contractor on the Second Cruise Pier Construction Project, is inviting suitably qualified persons to apply for available positions.

The commercial construction contract for building the second pier was signed between the St. Christopher Air and Sea Ports Authority (SCASPA) of the Government of St. Kitts and Nevis and the Canadian Commercial Corporation (CCC), a crown agent of the Government of Canada, which is the prime contractor with JV Driver, being the prime subcontractor. SCASPA’s engineer is AdeB Consultants to work alongside the Director of Public Works, Mr. Cromwell Williams. The Lender’s Engineer is EF Douglas and Associates, with Principal Consultant Errol Douglas. 

Leave a comment

Social Share Buttons and Icons powered by Ultimatelysocial
error

Enjoy this blog? Please spread the word :)